![](https://www.land-surveyors-perth.com.au/sites/default/files/styles/image_gallery/public/Cheriton%20Subdivision%20Plan%20-%20V8-page-001.jpg?itok=Aou2HRl5)
![](https://www.land-surveyors-perth.com.au/sites/default/files/styles/gallery_thumbnail/public/Cheriton%20Subdivision%20Plan%20-%20V8-page-001.jpg?itok=9oi2o-Ns)
Gingin Subdivision
Clients: Claymont
Scope: Cadastral, Consultation and Engineering
Project Duration: TBC
Start Date: August 2017
Project Overview
Located in Gingin WA, this country subdivision consists of 310 X 1 hectare lots along with natural parklands incorporated into the subdivision design. We are currently working through stage 1 and expected to be moving to stage 2 mid 2018
Scope of Works
- Features surveys
- Cadastral Pre-calculations and set out
- New lot set outs
- All associates applications and clearance requests
- Assistance with local authorities and government bodies
- Engineering design and set out
- Main road connection from Gingin 5km